Estimate the amount of materials you need for your dropped suspended ceiling.
Suspended ceiling grid layout calculator.
Judge ceiling systems history the early years.
It s based on the manufacturer s recommended installation practices.
This estimate doesn t include an allowance for waste.
Drop ceiling calculator and layout tool.
The length of each support wire should be the distance from the drop ceiling support to the hidden ceiling anchor point plus 9 inches extra on each end to tie.
30 per box for 8 top hangers 24 per box for 8 wall mold 60 per box of 2 cross t s.
We are open and we are staying safe.
Enter your tile item armstrong or other and the tool will find a match if it s.
If you are installing a 2 2 ceiling grid system it is a little easier to figure the layout.
Stud and track material calculator.
Required data entry room width feet room length feet distance from anchor to ceiling support.
These are estimates only.
Mf ceiling material calculator.
Learn more about our covid 19 response.
Other methods of installation may use more or less material.
Use the drop ceiling calculator to help lay out a 24 x 24 and 24 x 48 ceiling.
Then get an estimate of materials needed for your project.
The calculation of material needed is based on measurements but the actual amounts needed could be slightly different depending on how you lay out the grid.
A little time spent planning out your suspended ceiling grid layout will really help you as a installation blu print and in ordering material.
Tell us your room dimensions and joist direction and we ll tell you how to lay out your 24 x 24 or 24 x 48 drop ceiling grid and provide an accurate materials estimate for your space.
Dry lining material calculator.
Quite often you are not able to use full lengths.
There are really four main parts to a suspended ceiling.
Suspended ceiling layout planner.
30 per box for 8 mains 30 per box for 8 wall mold 60 per box of 2 cross t s.
Start with the length of the room and take the total dimension and deduct as many 2 ceiling tiles as you can without going over the total amount of the room.
Rp does not have a 4 cross t just 2.
Drop ceiling grid and materials calculator.
30 per box for 8 mains.