Slope the top of them inward so they don t stain the building façade.
Roof parapet coping detail.
Lightning protection system roof mounted paratread.
Construction detail c 1 the nrca roofing manual 8 31 17 ansi spri es 1 tested resistance.
Omg formed coping and formed coping plus products are easy to install tested and warranted systems that act as the roof s first line of defense.
100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
A critical and often overlooked design detail is at the termination of a parapet coping at a wall.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
High parapet copper roof.
Roofing nail at 6 o c.
Continuous cleat coping continuous cleat plus coping this coping system combines a continuous anchor cleat with an intermittent anchor clip.
On the roof side the cover is locked into a standing seam parapet cover.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
The top of the wall is covered by a copper coping cover similar to detail 9 3a.
Make sure that there is a waterproof membrane under the coping.
Expansion joint roof to wall paraguard expansion joint roof to wall wall with self terminating parapro flashing.
The omittance of the termination metal leaves an opening at the top of the coping and allows for moisture infiltration at the space between the parapet.
A combination of elements are used in this detail.
Parapet with paraguard coping.
Coping carlisle s coping systems are available in the same variety of colors and sizes as the fascia products.
The most common mistake at this intersection is to allow the metal coping to but up to the wall without the application of termination metal.
The easiest thing to get right about parapet construction is to keep rainwater from getting into the top of them.
Fri 12 13 2019 06 20.
Parapet with plywood sheathing.
This cover in turn laps over base flashing which is cleated to the roof deck or a nailing strip.
Metal and stone copings leak at joints.
Continuously hand crimp hem over cleat coping 1 1 2 long galvanized steel hex head screw with washer at 18 o c.
Curb with adhesive applied flashing.
The continuous formed anchor is 24 ga.
Hold your cursor over the file name to view when a drawing was last updated.
These high performance products provide more than enough protection at vulnerable parapet walls so you can be confident in the long term performance of your roofing system.
The principles are easy.