For all new construction.
Roof framing checklist.
Roof sheathing is nailed every 6 in.
Along the edges and every 12 in.
Determine how many rafters you ll need for the roof.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
Roof must be complete before framing inspection.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Roof framing inspection checklist 1.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
Wall framing inspection checklist continued m.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
Approved documents which show.
Add studs under all double girder truss double joist.
Locate the grade mark on the rafter to determine species and grade.
Determine if double studs are face nailed with 10d nails at 24 in.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Get fix for any cut damaged joist or truss from joist or truss company.
R802 3 the rafters are framed opposite each other at the ridges.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
Building is safe and accessible.
Truss roof framing as per design.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft.
The fields in the template include equipment standards of workers.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Toe nail rim board to sill plate at 6 on center.